NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs | NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs |
3
Services in Scope
4
Project Stages
1
NHAI Access Permission
1
Hilly Site, Solan
Project details

Safe entry and exit with streamlined circulation on limited land.

On a compact hilly plot, every metre counts. The station was planned so vehicles move in and out safely while making the most of the land available.

  • Project name Bala Ji Filling Station (BPCL)
  • Location Solan, Himachal Pradesh
  • Category Fuel Station / Retail Outlet
01 - Project Description

A compact roadside fuel station proposed on a hilly site. The project scope includes site surveying, efficient planning and design, safe entry and exit arrangements, streamlined vehicular circulation, optimum utilization of the available land, and coordination with NHAI for access permission.

01

Surveying

Accurate survey of the hilly site to understand its limits before any planning begins.

02

Planning & Designing

Efficient layout with safe entry and exit and smooth vehicle circulation on limited land.

03

Access Permission from NHAI

Coordination with NHAI to secure approval for access to the station.

Gallery

A closer look at the station

02 - Design Focus

Making the most of limited land.

The Brief

A compact roadside fuel station on a hilly site, where the available land is limited and vehicles must be able to enter and exit safely.

Our Approach

Plan around the site's limits so the station works smoothly from day one.

  • Safe entry and exit arrangements
  • Streamlined vehicular circulation
  • Optimum use of the available land
03 - How we work

From site survey to approved access.

  1. 1
    Site Surveying

    Surveying the hilly plot to understand its shape, levels and available area.

  2. 2
    Planning & Design

    Laying out the station to use the land efficiently.

  3. 3
    Entry, Exit & Circulation

    Arranging safe entry and exit points and streamlined vehicle movement.

  4. 4
    NHAI Access Permission

    Coordinating with NHAI to secure access permission for the station.