L o a d i n g
NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs | NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs |
3
Services in Scope
4
Project Stages
1
MoRTH Access Permission
1
Functional Forecourt
Project details

Clear entry–exit circulation and a functional forecourt.

The station was planned so vehicles move through smoothly and safely, with organised dispensing bays and an access arrangement that meets MoRTH requirements.

  • Project name Bala Ji Fuel Station (IOCL)
  • Location Balag, Shimla, Himachal Pradesh
  • Category Fuel Station / Commercial Infrastructure
01 - Project Description

A strategically planned fuel station featuring efficient vehicular movement, clearly defined entry–exit circulation, organized dispensing bays, and a functional forecourt designed in accordance with MoRTH access requirements.

01

Planning & Architectural Design

A clear layout with defined entry–exit circulation and organised dispensing bays.

02

Site Development

Preparing the site and forecourt for efficient vehicle movement.

03

Access Permission from MoRTH

Designing to MoRTH access requirements and securing the permission.

Gallery

A closer look at the station

02 - Design Focus

A station that moves traffic smoothly.

The Brief

A strategically planned fuel station at Balag, Shimla, with efficient vehicle movement and an access design that meets MoRTH requirements.

Our Approach

Plan the flow first, so the station is easy and safe to use.

  • Clearly defined entry–exit circulation
  • Organised dispensing bays
  • A functional forecourt designed to MoRTH access requirements
03 - How we work

From layout to approved access.

  1. 1
    Planning & Architectural Design

    Laying out the station for efficient vehicle movement.

  2. 2
    Entry–Exit & Circulation

    Defining clear entry and exit points and the paths vehicles follow.

  3. 3
    Site Development

    Preparing the site, dispensing bays and forecourt.

  4. 4
    MoRTH Access Permission

    Meeting MoRTH access requirements and securing permission.

Planning a fuel station?

Let's talk about layout, design and highway access approvals for your site.

Get in touch