L o a d i n g
NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs | NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs |
2
Core Services
4
Key Planning Elements
1
MoRTH Access Permission
1
Site at Taliwala
Project details

Clear entry–exit circulation and a functional forecourt.

From the moment a vehicle leaves the highway to the moment it drives away, every movement on the site was planned to be smooth, safe and compliant.

  • Project name Jio-bp Filling Station
  • Location Taliwala, Himachal Pradesh
  • Category Fuel Station / Commercial Infrastructure
01 - Project Description

A strategically planned fuel station featuring efficient vehicular movement, clearly defined entry–exit circulation, organized dispensing bays, and a functional forecourt designed in accordance with MoRTH access requirements.

01

Planning & Architectural Design

Layout and architecture for the fuel station, with efficient vehicular movement and organized dispensing bays.

02

Access Permission from MoRTH

Design prepared in accordance with MoRTH access requirements, with the permission obtained for the site.

03

Circulation & Forecourt

Clearly defined entry–exit circulation and a functional forecourt for smooth, safe movement on the site.

Gallery

A closer look at the project

02 - Focus & Approach

Smooth movement, built to the access rules.

The Focus

To plan a fuel station with efficient vehicular movement and clearly defined entry–exit circulation, designed in accordance with MoRTH access requirements.

Our Approach

We planned circulation, dispensing and compliance as one connected layout.

  • Clearly defined entry and exit points
  • Organized dispensing bays for efficient movement
  • A functional forecourt designed to MoRTH requirements
03 - How we delivered it

From site study to MoRTH approval.

  1. 1
    Site Study & Brief

    Understanding the site at Taliwala, its highway frontage and the project requirements.

  2. 2
    Planning & Layout

    Planning vehicular movement, entry–exit circulation and the position of dispensing bays.

  3. 3
    Architectural Design

    Designing the forecourt and structures so the station is functional and well organized.

  4. 4
    MoRTH Access Permission

    Preparing and following up the access permission in line with MoRTH requirements.

  5. 5
    Final Review & Handover

    Final checks and handover of the approved design.

Planning a fuel station?

Let's talk about a well-organized, compliant layout and a smooth access permission for your site.

Get in touch