NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs | NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs |
1
Fuel Station
2
Core Services
4
Planning Elements
4
Compliance Checks
Project details

Construction monitored for compliance with approved drawings and safety requirements.

From securing access permission to supervising construction on site, the work was guided by approved drawings, standards and safety requirements.

  • Project name Nayara Energy Ltd.
  • Location Lafughati, Shimla, Himachal Pradesh
  • Category Fuel Station
01 - Project Description

The project involved obtaining access permission from the concerned authorities in accordance with MoRTH guidelines, along with construction supervision for the proposed fuel station.

The scope included planning safe and efficient vehicular entry and exit, smooth internal circulation, organized dispensing bays, and a functional forecourt.

Construction activities were monitored to ensure compliance with approved drawings, applicable standards, safety requirements, and prescribed quality specifications.

01

Access Permission

Obtaining access permission from the concerned authorities in accordance with MoRTH guidelines.

02

Entry, Exit & Circulation

Safe and efficient vehicular entry and exit with smooth internal circulation.

03

Construction Supervision

Monitoring construction for compliance with approved drawings, standards, safety and quality specifications.

Gallery

A closer look at the project

02 - Challenge & Approach

Safe access, built to the approved plan.

The Challenge

Securing access permission in line with MoRTH guidelines, and making sure a fuel station is built safely and exactly as approved.

Our Approach

Plan the access first, then supervise the build against it.

  • Safe and efficient vehicular entry and exit
  • Smooth internal circulation, organized dispensing bays and a functional forecourt
  • Construction checked against approved drawings, standards, safety and quality specifications
03 - How we delivered it

From access permission to supervised construction.

  1. 1
    Access Permission

    Obtaining permission from the concerned authorities in accordance with MoRTH guidelines.

  2. 2
    Entry & Exit Planning

    Planning safe and efficient vehicular entry and exit for the fuel station.

  3. 3
    Internal Circulation

    Arranging smooth movement of vehicles within the site.

  4. 4
    Dispensing Bays & Forecourt

    Organizing the dispensing bays and a functional forecourt.

  5. 5
    Construction Supervision

    Monitoring construction for compliance with approved drawings, applicable standards, safety requirements and quality specifications.