L o a d i n g
NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs | NH / NHAI NOC | DC NOC | TCP / MC NOC | Forest & Fire NOC | Digging NOC | Soil & Material Testing | 3D Design Layouts | Land Survey | 118 Land Permission | Civil Contracts | Project MGMT Consultancy | PESO License | Pre-Feasibility Reports | 3D Modeling & Visualization | Valuation Reports | Estimation Services | Structural Designs |
1
Fuel Station (IOCL)
4
Scope Areas
5
Planning Elements
1
MoRTH Access Permission
Project details

Organized circulation, drainage planning and efficient use of the site.

A compact roadside fuel station planned to make the most of the available site while keeping vehicular access safe.

  • Project name Shivay Filling Station (IOCL)
  • Location Tatapani, Karsog, Mandi, Himachal Pradesh
  • Category Fuel Station / Retail Outlet
01 - Project Description

A compact roadside fuel station developed with efficient forecourt planning, safe vehicular access, organized circulation, drainage planning, and optimum utilization of the available site.

01

Surveying & Planning

Surveying the site and planning an efficient forecourt with organized circulation.

02

Site Development & Drainage

Developing the Tatapani site with drainage planning and optimum use of the available land.

03

Safe Access

Safe vehicular access, backed by access permission from MoRTH.

Gallery

A closer look at the project

02 - Goal & Approach

Making the most of a compact site.

The Goal

A compact roadside fuel station that makes optimum use of the available site, with safe vehicular access and organized circulation.

Our Approach

Plan the forecourt and access carefully so no part of the site goes to waste.

  • Efficient forecourt planning and organized circulation
  • Drainage planning built into the site layout
  • Safe vehicular access with MoRTH access permission
03 - How we delivered it

From the survey to safe access.

  1. 1
    Surveying

    Surveying the roadside site at Tatapani.

  2. 2
    Planning & Designing

    Planning an efficient forecourt with organized circulation.

  3. 3
    Drainage Planning

    Planning drainage for the compact site.

  4. 4
    Site Development

    Developing the site for optimum utilization of the available land.

  5. 5
    Access Permission from MoRTH

    Securing access permission for safe vehicular access.

Planning a roadside fuel station?

Let's talk about forecourt layout, drainage, site development and access permission for your outlet.

Get in touch